The lock of Veere

The locks of the city Veere connects the waterways “Veerse Meer” and “Kanaal door Walcheren” with each other and consists of two doors of 12 x 11 metres each.

Scope of work for MOPP:

  • Blasting and painting of the lock doors internally and externally.

Executed in 2012 within a period of 21 days.